Solar for farms, workshops and businesses

Your roof works too.

Barns, workshops, warehouses: we check the framing, study your daytime consumption and plan the installation around your activity, not the other way round.

Ask for a site visit

Our word, as between neighbours

A production study for your roof

Orientation, slope, shading and your consumption, estimated with PVGIS, the public tool of the European Commission. No sizing by eye.

An RGE certified installer

The RGE QualiPV certification is required for the self-consumption bonus and for selling your surplus. We give you the certificate with the quote.

The paperwork handled

Town hall declaration, connection request, Consuel certificate and the purchase contract: we prepare them, you sign.

Insured, and followed

Ten-year insurance on roof work, two years on fitted equipment, the manufacturers' warranties on top, and production you can follow from your phone.

Roofs at work

Recent roofs in the area, photographed once connected.

House on the hill

12 panels, micro-inverters

Montpellier, 2026, 1 day

Large tiled roof

24 panels, inverter and battery

Castelnau-le-Lez, 2026, 2 days

Blue panels on a gable roof

10 panels, inverter, diverter

Lattes, 2025, 1 day

Slate roof in two groups

14 black panels, optimisers

Mauguio, 2025, 2 days

Stone house by the water

16 full-black panels, micro-inverters

Sète, 2025, 2 days

Brick houses, south pan

9 panels, inverter, 7.4 kW charge point

Pérols, 2024, 1 day

Down the furrow

1

Technical visit

Roof, framing, shading, electrical panel and your bills: we look at everything on site.

2

Study and quote

Expected production, self-consumption, the aid as it stands that day and a detailed quote.

3

Paperwork and installation

Declaration accepted, panels and inverter fitted in one to two days, wiring to your panel.

4

Certificate and switch-on

Consuel certificate, connection, then the app set up with you to follow your production.

Good to know before you sign

Panels on a roof go through the town hall

They change the look of the house: a prior declaration is needed, and the opinion of the heritage architect in a protected area. We file it for you.

Aid depends on the rules of the day

The self-consumption bonus and the surplus purchase price follow the scale in force on the date of your request. We write them into the study as they stand that day.

Signed at home: 14 days, and no payment for 7

A contract signed at your home can be withdrawn within 14 days, and no payment can be asked for during the first 7 days. Be wary of anyone who asks.

A Consuel certificate before switching on

An installation connected to the grid is checked and certified before it is switched on. The VAT rate depends on the power and the panels: it is shown on the quote.

"Panels on the barn roof and a charge point in the yard. They planned it around the harvest."
Gérard L.Farm building and charge point
"They told us our east roof would produce less than the south one and showed us the figures. We went south, and they were right."
Bruno et Carole T.House, panels and surplus sale
"Town hall, connection, Consuel: I did not have to fill in a single form myself. The panels were up in two days."
Agnès V.Panels and battery

Ask for a free solar study

Tell us where the house is, what you know about the roof and roughly what you pay for electricity. We call you back to arrange a visit.

Rather talk about it? Call us:01 23 45 67 89